Service Category
Renovations & Construction
Bathroom, basement, condo and laneway-suite renovations across Mississauga and the GTA. Permits handled, in-house trades, fixed-price quotes.
What we do
Renovations are where most contractors fall apart — schedule overruns, blown budgets, three subcontractors blaming each other when something goes wrong. We do it differently: HVAC, plumbing, electrical and renovations all under one roof, with our own technicians. One project manager, one quote, one accountable team. From a single bathroom rebuild to a full laneway suite, we handle permits, design, build and finish.
All Services
Specific renovations & construction services
Bathroom Renovations
Full bathroom rebuilds: plumbing rough-in, tile, fixtures, vanities, ventilation.
Basement Renovations
Finished basement: framing, electrical, plumbing rough-in, HVAC, drywall, paint.
Condo Renovations
Condo-spec compliant rebuilds with property-management coordination.
Laneway Suite Renovations
Laneway suite design-build, including HVAC, plumbing, electrical and finishing.
Home Renovations
Whole-home and addition renovations.
General Construction
Smaller construction work and handyman projects.
Why QuickFast
Reasons to call us first
In-house trades
HVAC, plumbing and electrical all done by our own team — no scheduling conflicts.
Permit handling
We pull permits, schedule inspections, and coordinate with the city / condo board.
Fixed-price quotes
Itemized written quote covers everything — equipment, labour, permits, disposal, taxes.
Workmanship guarantee
Every renovation comes with a 12-month workmanship guarantee on labour.
Our Process
How we work — every job
- 1
Request an estimate
Call or submit our online form — we respond within one business hour.
- 2
Site visit + written quote
We inspect on-site and deliver a written fixed-price quote within 24 hours.
- 3
Schedule the work
We book a time that works for you. Same-day service available for most jobs.
- 4
Complete + follow up
We finish to spec, walk you through the result, and follow up within 7 days.
FAQ
Common questions
How long does a bathroom renovation take?
2-4 weeks for a typical full-gut bathroom — depending on tile complexity, fixture lead times, and whether the layout changes (which moves plumbing). We provide a written timeline with the quote.
Do I need a permit?
Most bathroom renovations don't (cosmetic) but plumbing/electrical changes do. Basement finishings and additions always do. Condo renos require board approval. We handle all permitting — it's part of the quote.
What's a laneway suite?
A small detached secondary dwelling unit on the laneway side of a Toronto residential property — a 2024 zoning change that lets homeowners add a rental unit. We design and build them turnkey, typically $250-450K depending on size and finishes.
Do you take on small jobs?
Yes — single-room work, tile repair, deck rebuilds, fence work, drywall patching. Our handyman rate is $145/hour with a 1-hour minimum.
Get a free quote on renovations & construction
We respond within 1 business hour. No high-pressure sales.
